| Information about you: |
| Company: |
|
| Your Name: * |
|
| Address: |
|
| City / State / ZIP: |
|
| Cell Phone: * |
|
| Email: * |
|
| STAUF Representative: |
|
| |
| Information about the jobsite: |
| Contractor Name: |
|
| Jobsite Name: |
|
| Jobsite Address: |
|
| Jobsite City, State, ZIP: * |
|
| Current Floor Coating: * |
|
| Intended Use of Floor: * |
|
| |
| Accessability: |
| Loading Dock available: |
Yes No |
| Floor is in climate controlled room: |
Yes No |
| Fork Lift available: |
Yes No |
| Number of 110V Outlets: |
|
| Number of 220V outlets: |
|
| Total square Footage: |
|
| |
| System and Components: |
| Select System: |
|
| Select Grinding: |
|
| Select Priming: |
|
| Select Leveling: |
|
| Select Base Color: |
Color Choices |
| Select Roll Coat (Garage/Warehouse only): |
|
| Select Flake/Quartz Color: |
Flakes Choices |
| Select Flake/Quartz Density: |
Flakes Densities |
| Select Top Coat: |
|
| Select Anti-Slip: |
|
| |
| Additional areas to be covered: |
| Coating on Wall: |
Yes No |
| Height (inch): |
|
| Width (feet): |
|
| Baseboard Height: |
|
| Baseboards (feet): |
|
| Cover Stairs: |
Yes No |
| Number of Stairs: |
|
| Width of Stairs: |
|
| |
| Additional jobsite conditions: |
| Vehicular Traffic (cars, forklift): |
Yes No |
| Sunlight exposed (includes indirect): |
Yes No |
| Width of transitions (LF): |
|
| Width of separation between pour (LF): |
|
| Length of spider cracks (LF): |
|
| Length of dynamic joints (LF): |
|
| Width of dynamic joints (in): |
|
| Area of spalling/broken surface (SF): |
|
| Average depth of patch required (in): |
|
| Area of contaminated surface (SF): |
|
| Installation of vinyl logos (SF): |
|
| |
| A little math: what is four plus four? * |
(This is to verify human input, not a robot.) |
| |
| |
|
| |